|
Gallery.
January
2012 saw F72 running at the head of trains!
Below;
Thought it
was time to put the F on the roster for the day, she spent all day
hauling empties! The new chassis seems to be still hanging in
there as it preformed faultlessly!

Below Left;
A62 was also out on a shunt note that she now has a driver at the
controls! Below Right; Q17 now in charge of F72s train on
the new section of ballasted track in the shed.


October
2011 saw the Running of Triple Header Dubs Locos!
ROCKY
CREEK RAILWAY was
the setting for an evening of Firsts! 3 Dubs locos from 3
different Railways were set to run together for the first
time. This was not as simple as it sounds as A62 was track
powered, John's A was battery with Aristo-Craft train engineer
& Glen's C53 is battery with his own remote system. So,
getting all locos running together was a realistic challenge for
all 3 drivers!!
Below;
4 pictures of the special train, the rolling stock of 4 wheelers
were supplied by Rocky Creek Rly, this was a great evening enjoyed
by all!!!



August
2011 saw Snow & Club Day at AFR!

Above
Left; A62 hauling Ja1268s tender on a test run on the morning
of club day. AboveRight; A LGB Aster Garratt (Visiting
Loco) running engine only to check the railways clearances before
hooking up to its train. Below; 2 pictures of C53 visiting
from the ROCKY
CREEK RAILWAY with
its rolling stock, I understand that the loco is now battery or
power operated & has a sound unit installed with a VERY LOUD
whistle!

Below;
15-08-2011 week before Club day snow hits AFR, we had at least 5 to
6 inches which was a good enough excuse to Play Trains!!! F72 can
be seen clearing the line just below No2 bridge.


May
15th 2011 saw American Muscle from Christchurch takes over the
AFR!

Above;
The battery powered Dash 9 was test run by Don Ellis after his
conversion from track power, I was very impressed with its hauling
ability! Below Left; 3 train running on the AFR a first!!
Top of picture Dash 9 (Battery Powered), middle of picture LGB
0-4-0 shunter (Battery Powered) & bottom of Picture 2
GPs (Track Powered). Below Right; Dons dash 9 passing
over Rays GPs, a great day was had by all with trains running all
afternoon! (The track Powered ones any-way ;-)


2006 in
charge of FCD-7s test run on the AFR 16th November 2010.


Above Right; AFRs
Rogers Q17 running on ROCKY
CREEK RAILWAY this
was the October meeting for the 'CGRS'. The bridge in the photo
was built by the late Frank Roberts a real pioneer in this scale,
some of his models can be seen {Here}.

AFR Hosts 'The
Christchurch Garden Railway Society' monthly club day.

Above Left;
C53 visiting from the Rocky Creek railway enjoys a long run. Above
Right; A UP 4-6-2 hauls a rake of modified Bachmann Jackson
Sharp Cars.

Above Left;
Is a USA Trains Hudson, a beautiful model which words can not
describe!! Above Right; A classic LGB train consisting of
4-wheelers.

Above Left;
LGB mallet, digital sound even the neighbours enjoyed this one. Above
Right; C53 & F72 passes the mallet, this is only a small
selection of the days running. A great day was had by all.

Ab730's 10th
anniversary run with a special outing with G43 on the ore train!

Above
Pictures; Ab730's 10yrs of service, has run on all 3 railways
that I have built. Is seen here with special head board double
heading with G43, AFRs Garrett on the ore train roster. I can not
speak highly enough of this loco it has never let me down in any
way, it is one of the best preforming locos that I have built.
Entered service Sept 2000.

Looking
back to the last run on the old Railway & the last train to
run before the track was wripped up!

Above
left; is Ab730 heading its last train out of tunnel No1 heading
back to the yard. Above Right; Dg2330 in charge in the oppisite
direction with its train. Take note of the up & down of the
track this is due to frost heave looks good in pictures but limits
running.

Above
Left; F72 at the other end of tunnel No1 track is starting to get
over grown. Above Right; the last train to run on the old AFR was
the GP-30 & 38 American Muscle. As you can see the track had
started to be taken up & the date, 01-05-2005 all the above
pictures were taken around this time

Boxing
day 2009 is a good reason for a day of running trains with most of
the NZR fleet stretching there wheels.

Above
Left; is Ab730 running a small goods train & not to be out done
on the Above Right; is A62 heading a light goods.

Dg2330
in charge passing the water vat, Top Left and not forgetting our
American roster is GP30 heading a fully loaded test
train of the new Yj hoppers.
Above
Left; is Ab730 heading a goods train on 29-09-09. Above
Right; Saw snow for the first time on the new AFR on June
2008, so the snow plow was put into action! But as you can see
from the pictures above & below there wasn't much.

|