About
This Site.
This site will promote 1:24 scale modelling,
mainly New Zealand prototypes but have ventured out to the
odd free lance model. I hope you will enjoy the site and it
gives you the inspiration to have ago at scratch
building........
About
The Railway.
The AFR is a 3rd
time lucky railway with the first 2 being learning curves & a
lot of fun on the way. The 2nd Railway was abandoned and pulled up after
AFR management decided
to modify it's operation & increase the running length of its
mainline. The managements main interest is the NZR rolling stock
which will be the main
stay of the roster with the freelance models being a close 2nd, but also keeping things interesting I will be
running USA Trains 1:29 for the long trains. This is to add a bit
of variation to the running of trains for the visitors to the
railway.

The above plan
gives you a rough layout idea of the route the trains take with
the shed being the main point of operation. The shed on the North
side has a 10m passing loop on the main line branching off to a
yard on the south side. There are tunnel portals at the West &
East ends heading out into the garden, the East end has a level
run over a wooden truss bridge (No1) to a single span steel girder
bridge (No2) then we hit a 2% grade down to a 4 span steel girder
bridge (No3) & at the end of this the grade increases to 3%
until we pass under No2 bridge where we level out. We are now
heading West passing over the concrete path & entering another
passing loop outside, then we head out of the loop & up
another 2% grade until we enter the West end tunnel portal of the
shed.

Above Left
& Middle; American muscle at work just crossing No3 bridge
easing onto the 2% grade. Above Left; Same train throttling
up for the 3% grade, passing a switcher on banking duties (if
required) sitting in the loop.
The main line
is wired up for single & dual train running track power, we
run 20volts @ 3.5amp with lap-top power supplies supplying the
East & West sections but with a flick of a switch we can go to
20volts @ 5amp for double heading or long trains when on single
running or just the East section when dual running with a bigger
power supply doing the work!! Single is great when working on the
railway or operating on your own & having a train running
around. Dual takes a bit more thinking with a remote in each hand
with trains running loop to loop where they can pass,
but 2 people we can travel loop to loop & swap trains or
sections resulting in a lot of fun!
As with most
garden railways we learn as we go along & by our mistakes but
there is always progress in one form or another. The AFR now has
its final track bed down so we can concentrate on other projects
slowly progressing in many ways.
|